Constructing the 2nd and 3rd Boxes

My Front Yard Slopes from
the House to the Street
And West to East

A set of boxes will create a
set of Flat & Level Areas

Now, getting the perimeters
exactly level is a challenge
that I almost accomplished

But, it took quite a while
and a good deal of tweaking

Then, after the perimeters
were set, came the digging
of the box bottom to
achieve the level area

It took a lot of work and
a lot of learning
Notice in some of the photos a small, electric rotortiller.
This little tool was all I had to level the rock-hard dirt and to get it down to the height for the boxes.