Constructing the 4th and 5th Boxes

The perimeters of the
2nd and 3rd boxes were
substantially complete

The next two boxes were
much more challenging
since they were in the most
slopped area of the yard.

The 2nd & 3rd boxes each
step down about 2 inches per
The next 4th & 5th  boxes stepped
down 6 and 8 inches respectively

That equated to an estimated
2-3  tons of dirt that had to
be moved and disposed of
and/or leveled out

The finished yard can be seen
in Early Spring 2023