Constructing the 4th and 5th Boxes
|
The perimeters of the 2nd and 3rd boxes were substantially complete The next two boxes were much more challenging since they were in the most slopped area of the yard. The 2nd & 3rd boxes each step down about 2 inches per The next 4th & 5th boxes stepped down 6 and 8 inches respectively That equated to an estimated 2-3 tons of dirt that had to be moved and disposed of and/or leveled out The finished yard can be seen in Early Spring 2023 |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Lawn Redo | The Old Front Yard | The 1st Box |
The 2nd & 3rd Boxes | Adding Ground Cover | Drip Irrigation |